Jacket of the transformer station
The jacket for the transformer station of the first german offshore windpark leaves the facility halls of WeserWind GmbH Construction Georgsmarienhütte in Wilhelmshaven. Foreground the belonging topside.
DownloadThe jacket for the transformer station of the first german offshore windpark leaves the facility halls of WeserWind GmbH Construction Georgsmarienhütte in Wilhelmshaven. Foreground the belonging topside.
DownloadWith 6 Multibird M5000 & 6 Repower 5M alpha ventus has a nominal power of 60 Megawatt.
DownloadA three phase AC wire (60km long) arrived at the isle Norderney and will be brought over the island and through the mudflat by use of a duct system.
DownloadAt a depth of 10m as much wire is put from the ship to the barge as is needed to reach mainland. This prodecure is obligatory, because only a barge can reach mainland by the beach.
DownloadA three phase AC wire of 60 km length and 3.500t of weight connects the first german offshore windpark to the german energy grid.
DownloadConstruction of alpha ventus: Assemlby of the tower of a Repower 5M (AV6)