Three-phase-AC wire is brought to mainland
A three phase AC wire (60km long) arrived at the isle Norderney and will be brought over the island and through the mudflat by use of a duct system.
Download -
Transpooling
At a depth of 10m as much wire is put from the ship to the barge as is needed to reach mainland. This prodecure is obligatory, because only a barge can reach mainland by the beach.
Download -
Connecting to the german energy grid
A three phase AC wire of 60 km length and 3.500t of weight connects the first german offshore windpark to the german energy grid.
Download -
Tower assembly on a wind power facility
Construction of alpha ventus: Assemlby of the tower of a Repower 5M (AV6)
Download -
Jacket substructure
Jacket substructures on their way to alpha ventus. Overall 6 Repower 5M were installed on these substructures.
Download -
-
Dimensions of a Jacket
The view inside a production hall of Burntisland Fabrication Ltd in Methil shows the true dimension of a jacket: The bottom end looks like an arrow and will be rammed into the ocean ground.
Download -
Topside of a transformer station
The topside of a transformer station is prepared for transport.