Transpooling
At a depth of 10m as much wire is put from the ship to the barge as is needed to reach mainland. This prodecure is obligatory, because only a barge can reach mainland by the beach.
DownloadAt a depth of 10m as much wire is put from the ship to the barge as is needed to reach mainland. This prodecure is obligatory, because only a barge can reach mainland by the beach.
DownloadA three phase AC wire of 60 km length and 3.500t of weight connects the first german offshore windpark to the german energy grid.
DownloadConstruction of alpha ventus: Assemlby of the tower of a Repower 5M (AV6)
DownloadJacket substructures on their way to alpha ventus. Overall 6 Repower 5M were installed on these substructures.
DownloadThe view inside a production hall of Burntisland Fabrication Ltd in Methil shows the true dimension of a jacket: The bottom end looks like an arrow and will be rammed into the ocean ground.
DownloadThe topside of a transformer station is prepared for transport.
DownloadA tugboat takes tripods to Wilhelmshaven. They were created in Verdal, Norway.
DownloadIn autumn 2008 the transformer station for alpha ventus was created.
DownloadThe standpipes diameter equals 3 meter. Later on the driven pipes will be put here to mount the jackets on the ocean floor.
Download